Get in touch
We're here for demo requests and any questions you have.
Type of request
Choose the channel that fits your request.
Sales and demo
Product walkthrough, licence options and a live session with your own plan.
General questions
Questions about the program, licensing and your machine line.
- Send an email
Press and partnerships
Corporate information and image requests
- Send an email
Personal data requests
Requests under Law No. 6698
What happens in the meeting?
We open your plan
Your own DXF plan or our sample house, and we build the wall panels.
We show the roof and production file
From Automatic roof to the .bde line, in the same model.
We talk about your line
Your machine profile, stations and licence options.
Frequently asked questions
What people ask us most about the program.
Write to us or send an email and we'll get back to you.
All contact channelsWhich files can I open?
DXF floor plans, including binary DXF, MLINE, ELLIPSE, SPLINE and dynamic blocks. The program does not read DWG; save the file as DXF in AutoCAD and open it.
Which rollforming machines does it work with?
The program writes production files for rollforming lines that read .bde lines. Rollform-80, 90, 140, 200 and 300 profiles come ready, and stations switch on or off per profile.
Let's check your machine's line format together in a meeting.
Does it do structural calculations?
QSteelCAD runs production checks: error check, minimum length, clashes and model audit. It also flags joints that need an engineer's approval.
Structural adequacy, including bracing and section choices, is for the project engineer to approve.
Do I need a separate program for presentations?
Renders with cladding, roof cover, rooms and furniture come from the same model, and quantities and cost export as CSV. Save images as PNG, JPG or BMP and the model as GLB.
How does licensing work?
The licence is activated online and tied to one computer. While the program is open the licence is checked regularly; it keeps running for 7 days without reaching the server.
Get in touch for packages and pricing.
Do updates affect my projects?
Updates keep your licence, settings and projects. Structures in older projects are recognised by newer versions, for example older double-collar K braces.
Which Windows versions does it run on, and how long is setup?
It runs on Windows 10 and Windows 11. The setup wizard installs everything it needs; setup takes about a minute.
